Modern Pacific Northwest ADU interior with floor-to-ceiling windows looking out at Mount Rainier and Douglas fir trees at golden hour
    Seattle · Tacoma · Est. 2007

    NW ADU Builders — Premium ADU & DADU Construction in Seattle, Tacoma & the Puget Sound

    Premium detached ADUs, garage conversions, and basement cottages crafted for Pacific Northwest homes. We don't just build square footage — we curate places to live.

    5.0· Google Reviews
    WA Licensed · Bonded · Insured

    93+

    ADUs Built

    6mo

    Avg. Timeline

    3

    Counties Served

    Quick Answer

    What NW ADU Builders does — in one paragraph.

    NW ADU Builders designs, permits, and builds ADUs and DADUs (backyard cottages) across Seattle, Tacoma, and the Puget Sound. A detached ADU typically costs $250,000–$450,000 and takes about 10–16 months end to end — with design, permitting, and construction covered in one fixed-price contract.

    • 93+ ADUs built across the Puget Sound
    • Fixed-price contracts (design + permits + build)
    • Serving King & Pierce Counties
    • Licensed, bonded & insured in Washington
    • Free site evaluation

    Free AI Feasibility Report

    What can you build on YOUR lot?

    Get a free AI-powered feasibility report for your property — zoning, what fits on your lot, cost range, and rental potential.

    Get My Free Lot Report
    Bellevue DADU · 780 sq ft · $268k ● Seattle Backyard Cottage · 650 sq ft · $241k ● Tacoma Garage Conversion · $112k ● Kirkland DADU · 900 sq ft · $310k ● Renton ADU · 550 sq ft · $198k ● Redmond DADU · 720 sq ft · $258k ● Bellevue DADU · 780 sq ft · $268k ● Seattle Backyard Cottage · 650 sq ft · $241k ● Tacoma Garage Conversion · $112k ● Kirkland DADU · 900 sq ft · $310k ● Renton ADU · 550 sq ft · $198k ● Redmond DADU · 720 sq ft · $258k ●

    Instant Estimate

    See your ADU's monthly rent & payback in 10 seconds.

    Type your zip code and size. We'll show local rent estimates, build cost, and how fast it pays for itself — based on 93+ Puget Sound builds.

    ADU ROI Calculator

    What could yours earn?

    2025 comps

    Market match: Bellevue / Medina

    Est. rent

    $2,808

    per month

    Build cost

    $281k

    turn-key

    Payback

    10.2 yr

    simple

    Get a real quote for 98004

    Net cash flow assumes 18% operating costs. Free site visit refines numbers.

    — Why Choose Us

    One team. Zero headaches. Guaranteed.

    Most contractors juggle three different subcontractors for design, permits, and construction. We do it all in-house — which means faster timelines, clearer communication, and no finger-pointing when something goes wrong.

    We've built over 40 ADUs across the Puget Sound. We know every inspector at Seattle DCI, every permit shortcut in Pierce County, and every zoning rule in Snohomish. That knowledge saves you months and thousands.

    Our fixed-price model means the number we quote is the number you pay. Period.

    Schedule Free Consultation →
    📐

    Design Included

    Full architectural drawings, engineering stamps, site plans — included in every quote. No surprise design fees.

    Fast Permits

    We use Seattle & Tacoma's pre-approved ADU plan sets. Permits in 2–6 weeks instead of 4–6 months.

    💰

    Fixed-Price Contracts

    Detailed scope. Locked price. No change orders unless YOU request changes. Guaranteed in writing.

    🌲

    NW Local Experts

    We live and build here. We know PNW soil conditions, rainfall considerations, and neighborhood design review processes.

    — What We Build

    Every ADU type, built to last 50 years.

    01Most Popular

    Backyard Cottage

    A fully independent structure in your backyard. Maximum privacy for tenants, maximum rental income for you. Most popular build type in King & Pierce County — we've built 25+.

    • Custom or pre-approved plans
    • 400–900 sq ft
    • 6–8 month build
    • $185k–$320k
    02Best ROI

    Garage Conversion

    Transform your existing garage into a fully permitted, livable space. Fastest permit path available. Uses existing structure — significant cost savings vs. new construction.

    • Attach to existing structure
    • 400–650 sq ft
    • 3–5 month build
    • $95k–$160k
    03Multi-Gen Favorite

    Attached or Basement ADU

    Add a self-contained suite to your existing home — basement conversion, above-garage addition, or attached unit. Perfect for multi-generational living.

    • Leverages existing foundation
    • 300–700 sq ft
    • 4–6 month build
    • $85k–$180k

    — How It Works

    From backyard to rental income in 5 steps.

    We've refined this process across 93+ builds. You barely have to lift a finger.

    1

    Free Site Visit

    We visit your property, assess zoning, soil, setbacks, utility connections. Same-day feasibility verdict.

    1–2 days
    2

    Design & Quote

    Architectural floor plans, 3D renders, engineering, detailed fixed-price proposal.

    1–2 weeks
    3

    City Permits

    We submit and track permits with Seattle DCI / Pierce County. We handle all revisions and inspector communications.

    4–8 weeks
    4

    Construction

    Site prep, foundation, framing, MEP, insulation, finishes. Weekly photo updates via text.

    3–6 months
    5

    Move-In Ready

    Final inspection, punch list, CO (Certificate of Occupancy). You get keys. We help you set rental price.

    1 week

    Frequently Asked Questions

    — Built for the Rain

    150 wet days a year. Engineered for every one.

    Most builders use the same wall assemblies they'd use in Phoenix. We don't. Every NW ADU is detailed for Puget Sound rain from the foundation up.

    Western Red Cedar Siding

    Exterior

    Western Red Cedar Siding

    Rain-screen gap · stainless fasteners

    Locally milled cedar with a vented rain-screen behind every plank. Water drains, the wall dries — no rot, no warping after the first wet winter.

    Standing-Seam Metal Roof

    Roof

    Standing-Seam Metal Roof

    26-gauge steel · 50-year finish

    Concealed-fastener standing seam sheds Puget Sound rain at any pitch. Snow slides off, moss can't take hold, and it outlasts comp shingles 3-to-1.

    Vapor-Permeable WRB

    Envelope

    Vapor-Permeable WRB

    Class-III WRB · taped seams

    A weather-resistive barrier that blocks bulk water but lets the wall breathe outward — the only assembly that survives 150 rainy days a year.

    Hover any material to see the rain.

    — Client Stories

    What homeowners say after living in their ADU.

    "NW ADU Builders took a complicated Bellevue permit process and made it completely painless. They knew exactly which inspectors to call and what they needed. Our DADU was done in 5.5 months and is now renting for $2,800/mo."

    Michael T.

    Bellevue · Backyard Cottage

    "The fixed-price contract was a game-changer. Other contractors gave us ranges. NW ADU gave us a number and stuck to it. Not a single surprise charge over 6 months. Highly recommend."

    Sarah & James K.

    Kirkland · 900 sq ft DADU

    "We wanted a place for my mother-in-law to live nearby but with privacy. The team designed a perfect 650 sq ft cottage with its own entrance, laundry, and small garden. She loves it. So do we."

    Rachel M.

    Seattle · DADU

    — Investment

    Transparent pricing. What you see is what you pay.

    These ranges reflect our recent builds. Every project gets a custom quote — we'll give you a number within 48 hours of site visit.

    Garage / Basement

    Conversion

    $85k–$160k

    300–650 sq ft · 3–5 months

    • Design & drawings
    • Permit application
    • All city fees
    • Licensed construction
    • MEP (plumbing/electrical/HVAC)
    • Interior finishes
    • Final inspection
    • Custom architecture
    • Premium finishes
    • Smart home pre-wire
    • Landscaping
    • Priority scheduling
    Get Quote
    Most Popular

    DADU · New Build

    Detached Cottage

    $185k–$320k

    400–900 sq ft · 5–7 months

    • Design & drawings
    • Permit application
    • All city fees
    • Licensed construction
    • MEP (plumbing/electrical/HVAC)
    • Interior finishes
    • Final inspection
    • Custom architecture
    • Premium finishes
    • Smart home pre-wire
    • Landscaping
    • Priority scheduling
    Get Quote

    Large Custom ADU

    Premium Custom

    $320k+

    800–1,200 sq ft · 7–10 months

    • Design & drawings
    • Permit application
    • All city fees
    • Licensed construction
    • MEP (plumbing/electrical/HVAC)
    • Interior finishes
    • Final inspection
    • Custom architecture
    • Premium finishes
    • Smart home pre-wire
    • Landscaping
    • Priority scheduling
    Get Quote

    ROI Calculator

    $1,700

    Monthly Net

    9.8 yrs

    Payback Period

    $100,000

    10-Year Gain

    — Service Area

    We build ADUs across the Greater Puget Sound.

    Licensed and actively building in King County, Pierce County, and Snohomish County.

    Not sure if we serve your area? Call us — we may travel for larger projects.

    Frequently Asked

    ADU & DADU questions, answered.

    Comparing your options? Read our prefab vs site-built ADU comparison for real 2026 Puget Sound cost and timeline numbers.

    — Get Started

    Ready to build?

    Let's talk about your property.

    Free on-site consultation. We come to you, assess your lot, tell you exactly what you can build and for how much. No pressure. No obligation.

    We typically respond within 2 business hours
    (253) 332-9333 info@nwadubuilders.com
    Mon–Sat · 7am–6pm PST
    Seattle, WA · Serving Puget Sound

    🔒 Your info is private. We never sell leads or share data.